Stakeholder Identification and Performance of World Bank Funded Projects in Kenya
DOI:
https://doi.org/10.53819/81018102t7015Abstract
The study sought to investigate the influence of stakeholder identification on the performance of World Bank funded projects in Kenya and to examine the moderating effect of project environment on this relationship. The purpose was grounded in the context of infrastructure development's crucial role in determining a country's overall productivity and economic development. However, performance issues in World Bank funded projects in Kenya, due to delays and limited stakeholder consultation, necessitated this investigation. The study adopted a positivism philosophy and employed a cross-sectional survey design, focusing on all 62 World Bank funded projects completed between 2016 and 2021. The target population consisted of 310 individuals, including project managers, coordinators, supervisors, monitoring and evaluation officials, and representatives from the National Treasury. Simple random sampling was used to select respondents, and primary data was collected through a self-administered questionnaire, supplemented by secondary data. Descriptive statistics, such as frequency, percentages, mean, and standard deviation, described the characteristics of the variables. Multiple regression models established relationships between the variables, and qualitative data underwent content analysis. The research instruments were validated through a pilot study. The findings revealed that stakeholder identification significantly influences the performance of World Bank funded projects in Kenya, rejecting the null hypothesis (H01). The coefficient of determination (R Square) of 0.679 indicates that stakeholder identification accounts for approximately 67.9% of the variance in project performance, highlighting its substantial impact. The ANOVA results further support this relationship, with a highly significant F-statistic of 247.318 (p < 0.001), indicating that the model incorporating stakeholder identification is a good fit for explaining project performance. Model coefficients revealed a strong positive relationship between stakeholder identification and project performance, with a standardized coefficient (beta) of 0.824, indicating a significant influence. The study concludes that stakeholder identification plays a critical role in the performance of World Bank funded projects in Kenya. The study recommends enhancing stakeholder identification practices and considering the project environment to improve the effectiveness of these projects.
Key words: Stakeholder identification, Project Environment, Project Implementation, World Bank funded projects, Performance.
References
Adan I. H., (2012).Influence of stakeholder’s role on performance of constituency’s development fund projects a case of Isiolo North Constituency, University of Nairobi, Kenya.
Atiibo, K. A. (2016). Examining Stakeholder management challenges and their impact on Project Management in the case of upper east region of Ghana. Kwame Nkrumah University of Science of Technology.
Buertey, J. Amofa, D and Atsrim F., (2016).Stakeholder Management on Construction Projects: A Key Indicator for Project Success, American Journal of Civil Engineering, 1(3) 9-12
Carley, E. (2016). Entprojectsrise Resource Planning-Integrating Application and Projects Process Across the Entprojectsrise, Computer Technology Research Corporation, Charleston, SC. computing, 2 (3) 44-53
Chauvet et al., (2016). Factors influencing implementation of community based projects undertaken by the banking industry in Kenya. a case of Barclays Bank of Kenya, Masters Dissertation, Kenyatta University, Nairobi
Freeman, R.E. (2004). Strategic Management: A stakeholder approach. Boston: Pitman.
Huemann, M., & Zuchi, D. (2018). Toward a comprehensive project management approach for HR projects. Vienna University of Economics and Business. John Wiley & Sons.
Ika, L. A. (2012). Project management for development; Why projects are failing and what can be done about it. Project Management Journal, 43(4), 27-41.
Ika, L. A., & Hodgson, D. (2011). Proceedings of the 5th making projects critical. Bristol Business School, Bristol; Briston, England.
Ika, L. A., Diallo, A., & Thuillier, D. (2012). Critical success factors for World Bank projects: An empirical investigation. International journal of project management, 30(1), 105-116.
Independent Evaluation Group. (2011). Results and performance of World Bank Group. Washington DC: World Bank.
Karanja, J. N. (2014). An investigation into the causes of delays in government housing construction projects: a case study of the national housing corporation-Nairobi county. University of Nairobi.
Kwak, A. A. (2015). Influences on construction project delivery time (PhD. thesis). Nelson Mandela Metropolitan University, Eastern Cape, South Africa.
Maina, S., & Kimutai, G. (2018). Stakeholder Management and Project Performance of Open Air Market Projects in Nyeri County, Kenya. Journal of Business and Management, 20(7), 47–56. doi:10.9790/487X-2007014756
Mitchell, R. K., Agle, B. R. & Wood, D. J. (2017). Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of Who and What Really Counts. Academy of Management Review. Vol 22, No 4, pp 853 – 886.
Moulid, H. M., Muchelule, Y. W., & Wechuli, W. T. (2021). Influence of stakeholders’ management on performance of Coast Development Authority projects in Kenya. The Strategic Journal of Business & Change Management, 8(2), 158-177.
Mugenda, O. M. & Mugenda, A.G. (2014). Research Methods: Quantitative and Qualitative Approaches. Acts press, Nairobi.
Ngacho, C. (2019). An Assessment of the Performance of Public Sector Construction Projects: An Empirical Study of Projects Funded Under Constituency Development Fund (CDF) in Western Province, Kenya. University of Delhi
Nthenge, F. M. (2014). Factors influencing sustainability of donor funded projects: a case of Wenje water projects in Tana River County, Kenya. University of Nairobi
Ogweno, B., Muturi, W., & Rambo, C. (2016). Determinants of timely completion of road construction projects financed by Kenya Roads Board in Kisumu county, International Journal of Economics, Commerce and Management, 4 (2), 360-402.
Patton, K. G. (2008). Leadership Theory & Practice (7th ed.). London, Great Britain: Sage.
Umumararungu, A., & Mulyungi, P. (2018). Influence of Stakeholder involvement on successful implementation of housing projects in Rwanda: A case of the Gate Real Estates Project. International Journal of Management and Commerce Innovations, 6(1), 576–590.
World Bank (2014). World Bank Corporate Scorecard Brochure. Washington, DC: World Bank.
World Bank (2019). Annual Report: Ending Poverty, Investing in Opportunity. Washington, DC: World Bank.
World Bank. (2015). Implementation completion and results, Report number 39290.Washington DC: World Bank.
World Bank. (2017). Projects and operations. Retrieved July 9, 2019, from World Bank: http://web.worldbank.org.